ACCEPTANCE TESTING OF THE SW & HW SYSTEM OF NOS (TURBINE DIVISION) FOR ZNPP-1

From 31 July to 2 August 2012 the acceptance testing of the SW & HW system of the normal operation system (turbine division) for unit 1 of Zaporizhzhya NPP was carried out at RPA “Impulse”.


SRPA “Impulse” is a leading Ukrainian designer, manufacturer, and supplier of highly-reliable instrumentation and control systems for nuclear power engineering and railways.
 
We are on social media: