On 4-8 April 2011, a workshop for personnel of company SE NNEGC “Energoatom” under Project TACIS U2.01/06 “Provision of technical assistance in development of a system of evaluation of products’ correspondence at the NPPs’ level” was held under the aegis of European Commission at ...
The thermal-monitoring stubs have been supplied to South-Ukraine NPP.
...The equipment of the MCR full-scale simulator has been supplied to unit 3 of Zaporizhzhya NPP.
...Представители ЗАО «СНПО «Импульс» приняли участие в III Международной специализированной выставке и конференции «Атомэкспо-Беларусь», проходивших 2-4 марта в в...
The equipment of the normal operation system (turbine division) based on UKTS-VL has been supplied to unit 3 of Zaporizhzhya NPP.
...