At Larino station of Donetsk Railway, trial operation has been completed and input-distributing-converting cabinets (ShVRP-ETs) have been put into commercial operation.

...

The UKTS-VL equipment (including a set of the monitoring and diagnostics system, basic and current distribution cabinets) has been supplied to unit 1 of Khmelnitsky NPP.

...

At power unit No. 1 of Zaporozhye NPP the software-hardware complex of control rod control system RCS-I was put into experimental operation.

...

The following systems were put into experimental operation at power unit No. 2 of Khmelnitskiy NPP:

...

The equipment of the normal operation system (turbine division) based on UKTS-VL has been supplied to unit 2 of Khmelnitsky NPP.

...

SRPA “Impulse” is a leading Ukrainian designer, manufacturer, and supplier of highly-reliable instrumentation and control systems for nuclear power engineering and railways.
 
We are on social media: