SRPA “Impulse” won the international tender financed using loans from EBRD for supply of the MDC-U microprocessor centralized traffic control within the framework of the project “Upgrade of Priority Railway Lines of Ukrainian Railways. Installation of Train Control ...
In May 2021, at EC post No.1 of Koziatyn-1 Station of the South-Western Railway, construction and installation works and commissioning works for the MPC-U microprocessor interlocking system were completed, the system monitors and controls 44 switches, 78 signals, and 67 micropro...
The Electronics Engineer of Cat. 2 of the Adjustment and Installation Section Yevhen Lakin became a Master of Sport of Ukraine.
...During a working visit to Lugansk region, President of Ukraine Volodymyr Zelenskyy met with the veteran of the Second World War, the ex-head of RPA “Impulse” Andrii Novokhatnii.
...In February 2021, the instrumentation and control systems of the normal operation systems for the reactor and turbine divisions (I&C of NOS TO and RO) have been put into trial operation at unit 2 of KhNPP.
...